This is a more economical maintenance practice, makes technicians more efficient, and is safer. Don’t break containment if it’s not absolutely necessary.
Read MoreThe results assure the end user that the orifice meter is fully serviceable and does not require maintenance.
Read MoreA primary use of flow meter verification systems (powered by diagnostic systems) is to assure the flow meter is operating correctly.
Read MoreDue to a mass balance issue, a natural gas station operator suspected a 12" 0.496 beta orifice meter was giving erroneous readings.
Read MoreOrifice Meter with Erroneous DP Reading, Power Station, 12” Orifice Meter.
Read MorePrognosis was installed on a 6”, 0.60 beta natural gas station Orifice Meter, The diagnostic response indicated a metering problem.
Read MoreDue to a mass balance issue, a natural gas station operator suspected a 12" 0.496 beta orifice meter was giving erroneous readings.
Read MorePrognosis was installed on a 4”, sch 40,0.4 beta orifice plate union meter in a natural gas station.
Read MoreA 10” 0.4 beta Venturi meter was calibrated to be Prognosis ready (see Figure), This meter was installed offshore
Read MorePrior to meter installation on a North Sea offshore platform, during calibration Prognosis detected an error in the 8" 0.4 beta keypad entered meter geometry.
Read MoreThe DP Diagnostics Prognosis Valysys and Phase Track systems were applied to Lansvirkjun geothermal saturated steam production flow orifice meters. Phase Track was specifically set to saturated steam conditions.
Read MoreHead of Innovation